Bathroom rough-in plumbing
Supply and drain lines run and inspected before the tiler closes the walls — the foundation of any bathroom renovation.
Services
Sink, dishwasher or garburator in an island: with no wall to hide the vent, the drain needs a different approach.
A kitchen island has no wall to run a standard vent up through. Depending on the floor layout and the distance to the stack, the answer is either a loop vent under the counter or a connection that respects the allowed slope and distance — the plumber works out what fits your floor, not the other way around.
The dishwasher, garburator and fridge water line often tie into the same point as the island sink; grouping those lines before the cabinetmaker installs the cabinets avoids drilling into the bottom of a module that's already in place.
As with the bathroom, everything is tested and documented before the countertop goes on, because going back under a finished island costs far more than a fix at the rough-in stage.
What's accessible below the floor changes the options completely. With a basement or crawlspace under the island, the plumber can often run the drain and vent from below without touching the finished floor at all. On a slab poured directly on grade — common on a ground floor or in a plex with no basement under that section — there's no access from below, and the only option becomes cutting the slab to pour a new drain into it, which changes both price and timeline significantly.
Even with a loop vent, there's a limit to how far the island can sit from the waste stack: past a certain point, the slope needed for water to drain properly no longer fits inside the available floor depth. When that's the case, the honest answer is to reconsider the island's position or add a lift pump under the counter rather than force a slope that's too shallow and will eventually cause backups.
The cabinetmaker needs the exact position of the drain, supply line and access panel before building the island cabinets, not after. An island built without that information usually ends with the plumber having to drill into the bottom of an already-assembled module to run the lines, which damages the finish and delays the countertop install. Confirming the plumbing plan before the cabinets are ordered avoids that rework.
In a condo, running a new drain under a kitchen slab can affect the ceiling of the unit or the parking garage below, which needs the syndicate's sign-off and sometimes notice to the affected neighbour. Price mostly tracks distance to the existing stack, whether the slab needs cutting, and how many appliances tie in; a lift pump, when one's needed, adds to the base price. The island's final layout and appliance positions need to be locked in with the cabinetmaker before this stage, because moving the sink after the cabinets are ordered costs more than adjusting the plan on paper.
A site visit confirms what no kitchen drawing can guarantee: the real distance between where you want the island and the existing stack, and what's actually under the floor at that spot. Having appliance spec sheets in hand — dishwasher, garburator, a fridge with a water dispenser — before that visit helps confirm the connections needed on the first pass, rather than discovering a particular hookup requirement after the cabinets are ordered. When the island sits too far from the stack for a standard loop vent, comparing the cost of a lift pump against moving the island a few centimetres closer to an existing wall often turns up the more economical option before the kitchen plan is finalized. It's also worth deciding at the same visit whether the island will carry a structural support post near the plumbing run, since that post can rule out the exact spot a drain would otherwise take and is far cheaper to work around on paper than after the subfloor is patched.
Free written quote. We call back the same business day.
Supply and drain lines run and inspected before the tiler closes the walls — the foundation of any bathroom renovation.
Moving a toilet or shower by a few feet usually means moving the drain — and its vent. We work out what's actually possible before anything gets broken open.
A carrier frame anchored to the structure, drain and supply built into the wall: more plumbing and framing work than a floor-mounted toilet, for a result that's easier to clean.
Sink, dishwasher or garburator in an island: with no wall to hide the vent, the drain needs a different approach.