Bathroom rough-in plumbing
Supply and drain lines run and inspected before the tiler closes the walls — the foundation of any bathroom renovation.
Areas we serve
The Plateau is the classic plex: units stacked two or three storeys high, an exterior staircase at the front and a narrow interior stair between units, with the bathroom often wedged between the kitchen and a bedroom. Running a new drain down through several floors means going through the units below, not just your own.
Many of these plexes kept their original waste stack, aligned vertically from floor to floor — an asset if the new bathroom stays close to that line, a real obstacle if the project wants to move it to the other side of the unit.
Supply and drain lines run and inspected before the tiler closes the walls — the foundation of any bathroom renovation.
Moving a toilet or shower by a few feet usually means moving the drain — and its vent. We work out what's actually possible before anything gets broken open.
A carrier frame anchored to the structure, drain and supply built into the wall: more plumbing and framing work than a floor-mounted toilet, for a result that's easier to clean.
Sink, dishwasher or garburator in an island: with no wall to hide the vent, the drain needs a different approach.
Free written quote. We call back the same business day.